Building supervision
Construction activities in Iissä are supervised by building boardThe Building Inspectorate is happy to guide and advise those undertaking a construction project on construction-related issues. The average time for issuing a building permit from the time the permit is submitted is approximately 3 weeks.
Work in accordance with the building permit must be started (notification of commencement) within three years and completed (final inspection) within five years of the permit being issued. Please remember to agree on the inspection period during the validity period of the permit. See more information: reviews
The timing of the inspections must be agreed separately with the building inspectors. NOTE! Building permits issued in 2021 will expire in 2026 if a final inspection has not been carried out.
Announcement of the commencement of a building permit
PVO-Vesivoima Oy has submitted a building permit application to the municipality of Ii for the construction of a fish farming hall with a floor area of 5199 m² and a volume of 905460 m³. The fish farming hall is 116,9 meters long, 48,4 meters wide and 7,6 meters high.
The construction area is below the Iin Raasakka power plant on property 139-401-33-0, at Käyränlenkki 50.
The area is subject to the expansion of the Ii central district master plan for 2025.
In the plan, the area is marked EN, i.e. an energy supply area.
The area is home to fish farming operations related to the Raasakka hydroelectric power plant, which implements the fisheries obligations of hydropower production. The construction project concerns the development of existing fish farming operations by covering the breeding ponds with a hall structure. The project does not change the intended use of the existing operations, but supports the implementation of the fisheries obligations already practiced in the area.
The announcement of the construction permit application with attached documents will be available on the Ii municipality website starting June 18, 2026.
Neighbors and interested parties, as well as others whose living environment, work or other conditions may be significantly affected by the implementation of the project, are given the opportunity to obtain information about the application and to make a complaint or express an opinion regarding the project.
Construction project-specific complaints and opinions should be submitted to the Iin Municipality Building Control at the address Iin Municipality, Building Control, Piisiltä 1, 91100 Ii or electronically. registry [at] ii.fi (registry[at]ii[dot]fi) by 31.7.2026 at 15.00 p.m.
If necessary, please contact building inspector Urpo Hyry, tel. 050-4302615, ext. urpo.hyry [at] ii.fi (urpo[dot]hyry[at]ii[dot]fi) and Jukka Lehtola tel. 040-5852119 ext. jukka.lehtola [at] ii.fi (jukka[dot]lehtola[at]ii[dot]fi).
In Iis 18.6.2026
Iin construction supervision
Attachments to the announcement:
- asemapiirustus
- floor plan
- facades
- formula
Building inspectors
We ask that you contact us by phone or email. Building inspectors can be reached at by phone on Mondays, Wednesdays and Fridays from 9 am to 15 pm between.
Applying for permits
All construction-related permits are applied for online: lupapiste.fi. The service is registered with bank codes. Through the project view, different parties can monitor the progress of transactions in the service in real time and supplement the necessary information - regardless of time and place.
Attachments
- Building ordinance
- Building inspection fee 2025
- Building inspection fee 2026
- Wastewater system renewal
- Waste water guide
Links
Contact
Building inspector Urpo Hyry
tel. 050 430 2615 urpo.hyry [at] ii.fi (urpo[dot]hyry[at]ii[dot]fi)
on vacation 10.8. - 6.9.2026
Building inspector Jukka Lehtola
tel. 040 585 2119 jukka.lehtola [at] ii.fi (jukka[dot]lehtola[at]ii[dot]fi)
on vacation 26.6. - 2.8.2026
Office Secretary Paula Tolonen
tel. 050 310 6859 paula.tolonen [at] ii.fi (paula[dot]tolonen[at]ii[dot]fi)
on vacation 24.6. - 2.8.2026